Skip to main content

Concept

In the architecture of global derivatives, the 2002 ISDA Master Agreement functions as the foundational operating system for bilateral financial contracts. Within this system, the Force Majeure clause, specifically Section 5(b)(ii), is a critical, yet often misunderstood, protocol. It is engineered to manage catastrophic failure.

During a systemic market event ▴ a condition where the very infrastructure of the market is compromised ▴ this clause fundamentally re-architects the flow of obligations between counterparties. It provides a structured mechanism to pause and potentially terminate transactions when performance becomes physically impossible or legally impracticable, moving beyond mere economic hardship.

The activation of this clause is not a matter of choice or convenience; it is a direct response to an external, uncontrollable event that severs a party’s connection to the market’s operational spine. Think of a government-mandated shutdown of payment systems, the nationalization of a critical clearing house, or a natural disaster that incapacitates a nation’s financial center. In such scenarios, the inability to perform is absolute.

The Force Majeure clause acknowledges this reality, creating a pre-defined pathway that prevents an immediate, disorderly collapse of all related transactions into default. It converts a sudden stop into a managed process, governed by a specific timeline and a clear hierarchy of rules.

The Force Majeure clause in the 2002 ISDA Agreement acts as a circuit breaker, temporarily suspending obligations to prevent an immediate default during a severe, market-wide disruption.

A Force Majeure Event under the 2002 ISDA is designated as a Termination Event, a category distinct from an Event of Default. This distinction is paramount. An Event of Default, such as a failure to pay, typically signifies a credit failure or breach by one party, granting the non-defaulting party the immediate right to terminate all transactions and crystallize its net claim. A Termination Event, conversely, is often triggered by circumstances beyond either party’s direct control.

The Force Majeure clause codifies this, recognizing that a party prevented from paying by a system-wide gridlock is in a different position than one that is simply unwilling or unable to pay due to its own financial state. The protocol thereby shifts the focus from bilateral failure to systemic interruption, altering the rights and duties of both parties to reflect the external reality.

A sharp, teal blade precisely dissects a cylindrical conduit. This visualizes surgical high-fidelity execution of block trades for institutional digital asset derivatives

Defining the Trigger Mechanism

The clause is triggered when a party, its credit support provider, or a specified entity is prevented from performing a material obligation by a “force majeure or act of state.” This event must be beyond the party’s control, and its effects must be insurmountable through “all reasonable efforts.” The term “reasonable efforts” is a critical gatekeeper; it does not obligate a party to incur a significant financial loss to circumvent the disruption. For instance, if a country’s payment system is offline, a party is not required to charter a private jet with physical currency to satisfy a payment obligation. The impossibility or impracticability must be genuine and not a product of economic inconvenience. This high threshold ensures the clause is reserved for true systemic dislocations, preserving the integrity of contractual obligations under all but the most extreme conditions.

Precision-engineered modular components, with transparent elements and metallic conduits, depict a robust RFQ Protocol engine. This architecture facilitates high-fidelity execution for institutional digital asset derivatives, enabling efficient liquidity aggregation and atomic settlement within market microstructure

How Does the Clause Alter the Legal Standing of a Transaction?

Upon the occurrence of a qualifying event, the contractual obligations do not vanish. Instead, they enter a state of suspension. This is a crucial architectural feature of the 2002 Agreement. The clause initiates an automatic “Waiting Period” of eight Local Business Days.

During this period, the failure to make a payment or delivery that is directly caused by the Force Majeure Event does not constitute an Event of Default. This provides a critical buffer, allowing time for the external disruption to potentially resolve. It is a systemically aware provision, designed to inject stability and predictability into an otherwise chaotic environment, giving both counterparties a clearly defined operational state while the external world is in flux.


Strategy

Strategically, the Force Majeure clause is a defensive shield and a managed contingency protocol. For a counterparty operationally crippled by a systemic event, its primary function is to prevent an immediate and potentially catastrophic Event of Default. For the other party, it imposes a mandatory pause, forcing a shift from immediate enforcement to a period of watchful waiting. Understanding the strategic interplay of this clause requires a deep appreciation for its procedural mechanics, particularly the Waiting Period and the hierarchy of events defined within the ISDA architecture.

The moment a Force Majeure Event occurs, the 2002 ISDA Agreement automatically imposes an eight-day Waiting Period. This is not an option; it is a hard-coded system response. During this interval, all payments and deliveries under any “Affected Transaction” ▴ those directly impacted by the event ▴ are suspended for both parties. This bilateral suspension is a key strategic element.

It prevents a scenario where one party is excused from performing while the other must still attempt to deliver into a void, ensuring a degree of equilibrium during the disruption. It gives the system breathing room, acknowledging that in a true systemic crisis, information is imperfect and immediate reactions can be value-destructive.

The strategic value of the Force Majeure clause lies in its ability to transform a sudden, uncontrolled default into a structured, time-limited suspension of obligations.
Intersecting metallic structures symbolize RFQ protocol pathways for institutional digital asset derivatives. They represent high-fidelity execution of multi-leg spreads across diverse liquidity pools

The Hierarchy of Events a Strategic Filter

The 2002 ISDA Agreement establishes a clear operational hierarchy to manage overlapping events. This is detailed in Section 5(c) of the agreement. If an event qualifies as both a Force Majeure and an Illegality (where a change in law makes performance illegal), it is treated as an Illegality. This is because Illegality often represents a more permanent and definitive barrier to performance.

However, if an event constitutes both a Force Majeure and a standard Event of Default (like Failure to Pay), the Force Majeure protocol takes precedence for the duration of the Waiting Period. This is the core of its defensive power. It shields the affected party from an immediate default notice, which would trigger cross-default provisions in other agreements and could lead to a rapid, uncontrolled liquidation of positions. By prioritizing the Force Majeure timeline, the ISDA framework forces a temporary, orderly pause over a disorderly, immediate termination.

Intersecting sleek components of a Crypto Derivatives OS symbolize RFQ Protocol for Institutional Grade Digital Asset Derivatives. Luminous internal segments represent dynamic Liquidity Pool management and Market Microstructure insights, facilitating High-Fidelity Execution for Block Trade strategies within a Prime Brokerage framework

Table of Comparative Event Treatments

The following table illustrates the strategic difference in how a failure to perform is treated under normal conditions versus under a Force Majeure Event.

Scenario Treatment Under Normal Conditions Treatment Under Force Majeure Event Governing ISDA Section
Party A fails to make a scheduled payment. Triggers an Event of Default (Failure to Pay) under Section 5(a)(i) after a grace period. Party B can issue a termination notice. The failure to pay is excused during the 8-day Waiting Period. It does not constitute an Event of Default. Obligations are suspended. 5(a)(i), 5(b)(ii), 5(c)
Party A fails to deliver securities as required. Triggers an Event of Default (Breach of Agreement) under Section 5(a)(ii) after a grace period. Party B can terminate. The failure to deliver is excused during the 8-day Waiting Period. It does not constitute an Event of Default. Obligations are suspended. 5(a)(ii), 5(b)(ii), 5(d)
A change in law makes the transaction illegal. Triggers an Illegality Termination Event under Section 5(b)(i). A shorter 3-day Waiting Period applies. If the event is also a Force Majeure, it is treated as an Illegality. The Illegality protocol (3-day wait) supersedes the Force Majeure protocol. 5(b)(i), 5(c)
A sophisticated, modular mechanical assembly illustrates an RFQ protocol for institutional digital asset derivatives. Reflective elements and distinct quadrants symbolize dynamic liquidity aggregation and high-fidelity execution for Bitcoin options

Navigating the Post Waiting Period Landscape

The strategy shifts once the eight-day Waiting Period concludes. If the event is still ongoing, the Force Majeure Event matures into a full Termination Event. At this point, either party has the right to designate an Early Termination Date for all Affected Transactions. The key here is that the termination is on a no-fault basis.

The close-out calculations are performed, but the stigma and cascading consequences of a formal Event of Default are avoided. If the event ceases during the Waiting Period, the suspension lifts, and the parties are expected to resume performance, making good on the delayed payments and deliveries. The strategic decision-making for a counterparty, therefore, involves continuous assessment of the systemic event and a calculated judgment on whether to proceed toward termination or prepare for the resumption of obligations.


Execution

The execution of the Force Majeure clause is a precise, time-sensitive protocol. It demands immediate and accurate assessment by a firm’s legal, operational, and risk management functions. The process is not a negotiation; it is the enactment of a pre-agreed system contingency plan embedded within the ISDA framework. A failure to execute this protocol correctly can lead to disputes and potentially invalidate the protections the clause is designed to offer.

A precise intersection of light forms, symbolizing multi-leg spread strategies, bisected by a translucent teal plane representing an RFQ protocol. This plane extends to a robust institutional Prime RFQ, signifying deep liquidity, high-fidelity execution, and atomic settlement for digital asset derivatives

The Operational Playbook for a Force Majeure Event

When a systemic market event occurs, a counterparty must follow a clear sequence of actions to properly invoke the Force Majeure protocol. This playbook ensures compliance with the terms of the 2002 ISDA Master Agreement.

  1. Event Identification and Assessment ▴ The first step is to determine if a market disruption qualifies as a Force Majeure Event. This involves answering critical questions ▴ Is performance truly impossible or impracticable, not just economically disadvantageous? Is the event beyond the firm’s control? Have all reasonable efforts been exhausted to overcome the impediment? This assessment must be documented thoroughly.
  2. Automatic Activation of Waiting Period ▴ The eight Local Business Day Waiting Period begins automatically from the occurrence of the event itself, not from the time of notification. This means a firm’s internal clock must start ticking immediately, even before formal communication with the counterparty.
  3. Prompt Notification ▴ Section 5(d) of the 2002 ISDA requires each party to notify the other “promptly upon becoming aware of it.” This notice should specify the nature of the Force Majeure Event and identify the transactions affected. While the Waiting Period is automatic, failure to provide prompt notice could be contentious and may lead to disputes over whether a party can rely on the suspension of its obligations.
  4. Suspension of Performance ▴ During the Waiting Period, the affected party must suspend payments and deliveries under the Affected Transactions. Critically, the non-affected party must also suspend its corresponding obligations to the affected party. Attempting to make a payment or delivery that the other side cannot receive could create unnecessary operational risk.
  5. Monitoring and Re-evaluation ▴ Throughout the Waiting Period, the firm must continuously monitor the systemic event. If the disruption ceases, the firm must prepare to resume performance on the next business day.
  6. Post-Waiting Period Decision ▴ If the event persists beyond the eighth day, the Force Majeure Event becomes a right to terminate. The firm must then make a strategic decision ▴ designate an Early Termination Date or wait further. This decision will depend on the perceived likelihood of resolution and the firm’s risk appetite. If termination is chosen, a formal notice must be sent specifying the termination date for the Affected Transactions.
The image depicts an advanced intelligent agent, representing a principal's algorithmic trading system, navigating a structured RFQ protocol channel. This signifies high-fidelity execution within complex market microstructure, optimizing price discovery for institutional digital asset derivatives while minimizing latency and slippage across order book dynamics

Quantitative Modeling and Data Analysis

The financial implications of invoking the Force Majeure clause are significant. While it prevents a default, termination still requires a close-out calculation to determine the net settlement amount between the parties. The valuation of these positions can be extremely challenging during a systemic event where market data is unreliable or unavailable. The agreement provides fallback mechanisms for valuation, but these can be points of contention.

In a systemic crisis, the execution of the Force Majeure clause becomes a test of a firm’s operational resilience and its capacity for rapid, precise legal and financial analysis.

The table below provides a hypothetical analysis of counterparty obligations under different systemic scenarios, detailing the shift in duties as the Force Majeure protocol is executed.

Systemic Event Scenario Standard Counterparty Obligation Obligation During 8-Day Waiting Period Obligation After 8-Day Waiting Period (Unresolved)
National Payment System Failure ▴ Fedwire is offline for an extended period. Party A must make a USD payment to Party B. Failure is an Event of Default. Party A’s payment obligation is suspended. Party B’s corresponding obligations are also suspended. Becomes a Termination Event. Either party may terminate the affected USD-denominated transactions.
Sovereign Action ▴ Government seizes assets of a specific type, preventing delivery of bonds under a repo transaction. Party A must deliver the seized bonds. Failure is an Event of Default. Party A’s delivery obligation is suspended due to an “act of state.” Becomes a Termination Event. Either party can terminate the affected repo transaction.
Catastrophic Cyber Attack ▴ A central clearing house (e.g. LCH) is incapacitated, preventing settlement of cleared derivatives. Parties must perform according to CCP rules. Failure to meet margin calls is a default. Performance is impossible. The Force Majeure clause is triggered, suspending obligations related to settlement. Becomes a Termination Event. Parties can terminate the transactions, though valuation would be exceptionally complex.
A central dark nexus with intersecting data conduits and swirling translucent elements depicts a sophisticated RFQ protocol's intelligence layer. This visualizes dynamic market microstructure, precise price discovery, and high-fidelity execution for institutional digital asset derivatives, optimizing capital efficiency and mitigating counterparty risk

What Are the Practical Hurdles to Invocation?

Despite its clear codification, invoking Force Majeure is a significant step with practical challenges. The burden of proof rests entirely on the party claiming the event. This requires compiling robust evidence that performance was truly impossible, not merely difficult. Furthermore, there is the risk of a dispute over the “reasonable efforts” provision.

A counterparty might argue that alternative, albeit costly, performance methods were available. These potential disputes mean that the decision to declare a Force Majeure Event must be made with high confidence and be backed by a clear, defensible record of the event and the firm’s attempts to overcome it.

Modular institutional-grade execution system components reveal luminous green data pathways, symbolizing high-fidelity cross-asset connectivity. This depicts intricate market microstructure facilitating RFQ protocol integration for atomic settlement of digital asset derivatives within a Principal's operational framework, underpinned by a Prime RFQ intelligence layer

References

  • Katten Muchin Rosenman LLP. “Force Majeure Clauses and Financially Settled Transactions Under the ISDA Master Agreement.” 1 April 2020.
  • Fieldfisher. “ISDA Force Majeure Provisions ▴ competing notices.” 24 March 2020.
  • U.S. Securities and Exchange Commission. “ISDA 2002 Master Agreement.” 2002.
  • The Jolly Contrarian. “Force Majeure Event – ISDA Provision.” 14 August 2024.
  • Katten Muchin Rosenman LLP. “Part II ▴ Force Majeure Clauses and Physically Settled Power Hedges Under the ISDA North American Power Annex.” 15 April 2020.
A sleek, futuristic object with a glowing line and intricate metallic core, symbolizing a Prime RFQ for institutional digital asset derivatives. It represents a sophisticated RFQ protocol engine enabling high-fidelity execution, liquidity aggregation, atomic settlement, and capital efficiency for multi-leg spreads

Reflection

The architecture of the 2002 ISDA Master Agreement provides a robust protocol for navigating systemic failure. The Force Majeure clause is a testament to this design, offering a structured path through chaos. Its existence compels a deeper consideration of operational resilience. Is your firm’s internal framework calibrated to detect a true Force Majeure Event in real-time?

Are your communication protocols with counterparties sufficiently robust to execute the notification requirements flawlessly under extreme stress? The knowledge of this clause is one component; its seamless integration into a firm’s living risk management and operational systems is what creates a decisive edge when market stability evaporates.

A sophisticated metallic mechanism with integrated translucent teal pathways on a dark background. This abstract visualizes the intricate market microstructure of an institutional digital asset derivatives platform, specifically the RFQ engine facilitating private quotation and block trade execution

Considering the Unthinkable

Ultimately, the Force Majeure clause forces institutions to model the unthinkable ▴ the complete failure of a core piece of market infrastructure. Contemplating its use requires a shift in mindset, from managing credit and market risk to assessing fundamental systemic and operational vulnerabilities. The strength of a counterparty relationship is not only tested by market volatility but by its ability to adhere to a shared, logical protocol when the system itself breaks down. This clause provides that protocol, a blueprint for maintaining order amidst disorder.

A sophisticated system's core component, representing an Execution Management System, drives a precise, luminous RFQ protocol beam. This beam navigates between balanced spheres symbolizing counterparties and intricate market microstructure, facilitating institutional digital asset derivatives trading, optimizing price discovery, and ensuring high-fidelity execution within a prime brokerage framework

Glossary

Precision cross-section of an institutional digital asset derivatives system, revealing intricate market microstructure. Toroidal halves represent interconnected liquidity pools, centrally driven by an RFQ protocol

2002 Isda Master Agreement

Meaning ▴ The 2002 ISDA Master Agreement represents a standardized bilateral contractual framework for over-the-counter (OTC) derivatives transactions.
A sleek, dark metallic surface features a cylindrical module with a luminous blue top, embodying a Prime RFQ control for RFQ protocol initiation. This institutional-grade interface enables high-fidelity execution of digital asset derivatives block trades, ensuring private quotation and atomic settlement

Force Majeure Clause

The 2002 ISDA Force Majeure clause contains counterparty risk by re-categorizing non-performance as a logistical, not credit, failure.
A polished, light surface interfaces with a darker, contoured form on black. This signifies the RFQ protocol for institutional digital asset derivatives, embodying price discovery and high-fidelity execution

Systemic Market Event

An Event of Default is a fault-based protocol for counterparty failure; a Termination Event is a no-fault protocol for systemic change.
An institutional-grade platform's RFQ protocol interface, with a price discovery engine and precision guides, enables high-fidelity execution for digital asset derivatives. Integrated controls optimize market microstructure and liquidity aggregation within a Principal's operational framework

Force Majeure

Meaning ▴ Force Majeure designates a contractual clause excusing parties from fulfilling their obligations due to extraordinary events beyond their reasonable control, such as natural disasters, acts of war, or government prohibitions, which render performance impossible or commercially impracticable.
A central multi-quadrant disc signifies diverse liquidity pools and portfolio margin. A dynamic diagonal band, an RFQ protocol or private quotation channel, bisects it, enabling high-fidelity execution for digital asset derivatives

Force Majeure Event

Meaning ▴ A Force Majeure Event denotes an unforeseeable and unavoidable circumstance that prevents a party from fulfilling its contractual obligations, thereby absolving them from liability for non-performance.
An intricate mechanical assembly reveals the market microstructure of an institutional-grade RFQ protocol engine. It visualizes high-fidelity execution for digital asset derivatives block trades, managing counterparty risk and multi-leg spread strategies within a liquidity pool, embodying a Prime RFQ

Termination Event

Meaning ▴ A Termination Event denotes a pre-specified condition or set of criteria, contractually defined or algorithmically encoded, whose verified occurrence mandates the immediate cessation or unwinding of a financial agreement, especially prevalent within institutional digital asset derivatives.
Intricate metallic components signify system precision engineering. These structured elements symbolize institutional-grade infrastructure for high-fidelity execution of digital asset derivatives

All Reasonable Efforts

Meaning ▴ All Reasonable Efforts defines a rigorous, computationally-driven commitment within an execution system to achieve a specified outcome by deploying optimal algorithmic logic and systemic resources, operating within predefined operational parameters and market conditions.
A light sphere, representing a Principal's digital asset, is integrated into an angular blue RFQ protocol framework. Sharp fins symbolize high-fidelity execution and price discovery

Reasonable Efforts

Meaning ▴ Reasonable Efforts, within the operational context of institutional digital asset derivatives, defines a pragmatic and measurable standard of diligence applied to achieve a specified objective, such as optimal execution or risk mitigation, without providing an absolute guarantee of outcome.
Abstract geometric forms in blue and beige represent institutional liquidity pools and market segments. A metallic rod signifies RFQ protocol connectivity for atomic settlement of digital asset derivatives

Eight Local Business

Local volatility models define volatility as a deterministic function of price and time, while stochastic models treat it as a random process.
A conceptual image illustrates a sophisticated RFQ protocol engine, depicting the market microstructure of institutional digital asset derivatives. Two semi-spheres, one light grey and one teal, represent distinct liquidity pools or counterparties within a Prime RFQ, connected by a complex execution management system for high-fidelity execution and atomic settlement of Bitcoin options or Ethereum futures

Waiting Period

Meaning ▴ A waiting period represents a mandated temporal delay imposed before a specific system action, such as order execution or data release, can proceed.
A transparent, blue-tinted sphere, anchored to a metallic base on a light surface, symbolizes an RFQ inquiry for digital asset derivatives. A fine line represents low-latency FIX Protocol for high-fidelity execution, optimizing price discovery in market microstructure via Prime RFQ

Eight-Day Waiting Period

A force majeure waiting period transforms contractual stasis into a hyper-critical test of a firm's adaptive liquidity architecture.
Glowing teal conduit symbolizes high-fidelity execution pathways and real-time market microstructure data flow for digital asset derivatives. Smooth grey spheres represent aggregated liquidity pools and robust counterparty risk management within a Prime RFQ, enabling optimal price discovery

2002 Isda Agreement

Meaning ▴ The 2002 ISDA Master Agreement represents the industry-standard legal framework governing bilateral over-the-counter derivatives transactions globally.
A precision-engineered apparatus with a luminous green beam, symbolizing a Prime RFQ for institutional digital asset derivatives. It facilitates high-fidelity execution via optimized RFQ protocols, ensuring precise price discovery and mitigating counterparty risk within market microstructure

Isda Agreement

Meaning ▴ The ISDA Master Agreement represents a foundational contractual framework for over-the-counter (OTC) derivatives transactions, establishing a standardized set of terms that govern all individual trades executed between two counterparties.
An institutional grade RFQ protocol nexus, where two principal trading system components converge. A central atomic settlement sphere glows with high-fidelity execution, symbolizing market microstructure optimization for digital asset derivatives via Prime RFQ

Force Majeure Protocol

The 2002 ISDA Force Majeure clause contains counterparty risk by re-categorizing non-performance as a logistical, not credit, failure.
A sleek, split capsule object reveals an internal glowing teal light connecting its two halves, symbolizing a secure, high-fidelity RFQ protocol facilitating atomic settlement for institutional digital asset derivatives. This represents the precise execution of multi-leg spread strategies within a principal's operational framework, ensuring optimal liquidity aggregation

Affected Party

Meaning ▴ An Affected Party denotes any entity, system, or operational component whose status, financial exposure, or functional performance is directly altered by the execution of a protocol, the occurrence of a market event, or a systemic change within a digital asset derivatives ecosystem.
An abstract composition featuring two intersecting, elongated objects, beige and teal, against a dark backdrop with a subtle grey circular element. This visualizes RFQ Price Discovery and High-Fidelity Execution for Multi-Leg Spread Block Trades within a Prime Brokerage Crypto Derivatives OS for Institutional Digital Asset Derivatives

Under Normal Conditions

ML models differentiate leakage and impact by classifying price action relative to a learned baseline of normal, order-driven cost.
An advanced digital asset derivatives system features a central liquidity pool aperture, integrated with a high-fidelity execution engine. This Prime RFQ architecture supports RFQ protocols, enabling block trade processing and price discovery

Early Termination Date

Meaning ▴ The Early Termination Date specifies a pre-agreed date or a date triggered by specific events, upon which a derivative contract or financial agreement concludes prior to its originally scheduled maturity.
Abstract geometric representation of an institutional RFQ protocol for digital asset derivatives. Two distinct segments symbolize cross-market liquidity pools and order book dynamics

Affected Transactions

Meaning ▴ Affected Transactions refers to a distinct subset of financial operations within a trading system that are subject to specific, pre-defined conditions, rules, or regulatory mandates which alter their standard processing flow.
A sleek, multi-layered institutional crypto derivatives platform interface, featuring a transparent intelligence layer for real-time market microstructure analysis. Buttons signify RFQ protocol initiation for block trades, enabling high-fidelity execution and optimal price discovery within a robust Prime RFQ

Isda Master Agreement

Meaning ▴ The ISDA Master Agreement is a standardized contractual framework for privately negotiated over-the-counter (OTC) derivatives transactions, establishing common terms for a wide array of financial instruments.
A high-fidelity institutional digital asset derivatives execution platform. A central conical hub signifies precise price discovery and aggregated inquiry for RFQ protocols

2002 Isda

Meaning ▴ The 2002 ISDA Master Agreement constitutes a standardized contractual framework, widely adopted within the over-the-counter (OTC) derivatives market, establishing foundational terms for bilateral derivatives transactions.
A sophisticated internal mechanism of a split sphere reveals the core of an institutional-grade RFQ protocol. Polished surfaces reflect intricate components, symbolizing high-fidelity execution and price discovery within digital asset derivatives

Close-Out Calculation

Meaning ▴ The Close-Out Calculation is the precise algorithmic determination of a final net financial obligation or entitlement arising from the termination or liquidation of one or more derivative positions, typically triggered by a pre-defined event such as a margin breach or contract expiry.
A modular component, resembling an RFQ gateway, with multiple connection points, intersects a high-fidelity execution pathway. This pathway extends towards a deep, optimized liquidity pool, illustrating robust market microstructure for institutional digital asset derivatives trading and atomic settlement

Master Agreement

A Prime Brokerage Agreement is a centralized service contract; an ISDA Master Agreement is a standardized bilateral derivatives protocol.